Smart locker implementation and service

We run the implementation from the first conversation to a working locker. We build the lockers in Poland, and our qualified installers deliver and install them. After that, AddParcel monitors the locker’s operation, and we fix faults remotely or on site.

Implementation steps

  1. Conversation

    We ask what is to go into the compartments, how many parcels there will be a day and where the locker should stand. On that basis we choose the locker line, the number of modules and how the compartments will be opened.

  2. Site survey

    We assess the site in person or from photos. Then we confirm where and how the locker will be installed.

  3. Integrations

    At the start of the implementation we agree what the locker is to be connected to: staff cards, the order system or the carrier’s system.

  4. Transport and installation

    Our qualified installers deliver the locker, set it up, connect and configure it.

  5. Testing

    After installation, we test the whole process at the locker and in the panel together with the customer’s team.

  6. Training and launch

    We train administrators and employees in using AddParcel, online. After the training, selected members of the customer’s team run the locker from the web panel.

What needs to be prepared before installation?

The requirements concern power, internet access, the floor and the space around the locker. We confirm the details during the site survey.

  • Power supply

    A 230 V connection where the locker will stand.

  • Internet

    A LAN cable run to the locker, or LTE coverage.

  • Floor or wall

    A stable, level floor for a free-standing locker. For a wall-mounted one, a solid concrete or brick wall.

  • Space around it

    Free space around the locker, needed for installation and service. We specify its dimensions during the site survey.

  • Outdoor installation

    We install outdoor lockers when the ground and the air are at least +5°C, so we plan winter installations in advance. The compact outdoor locker needs no foundation.

  • Transport

    We deliver free-standing lockers on a lorry with a loader crane, and set up the compact outdoor locker without one.

Service and monitoring after launch

  • Service across Poland

    We fix faults remotely or on site, with our service technicians and partner companies. The response time is set in the service agreement.

  • Locker monitoring

    AddParcel tracks connectivity and power, compartment locks and doors, and how the components are working. The administrator learns about a fault from a notification, and our service team uses the same data.

    Locker monitoring and reports

  • Updates and backups

    The data is kept in the Addictive cloud, on servers in Poland. We handle updates, backups and technical support.

  • Extending the locker

    As the number of parcels grows, the locker can be extended with further locker modules, also once it is in use. The central module and the software remain unchanged.

    Smart locker lines

Let’s talk

Our expert asks what is to go into the compartments, and helps choose the right locker model and plan the changes to the processes that are to be automated.

The controller of the data is Addictive Group Sp. z o.o., al. Józefa Piłsudskiego 92, 92-202 Łódź, Poland. We process the data given in the form to respond to the enquiry and, with consent, also for marketing. Details, including the rights of data subjects, are in the privacy policy.